Skip to content
Resources

QLD Body Corporate Committee Spending Limit Calculator

Calculate the spending limit for your Queensland body corporate committee and find out when two quotes are required. Covers Standard, Accommodation, Small Schemes, Commercial and Specified Two-lot modules.

Last verified: October 2026
Loading calculator…

General information only.This calculator provides general information based on Queensland body corporate legislation. It is not legal advice. Your scheme's community management statement, any resolutions passed by your body corporate, and your specific circumstances may affect the rules that apply. Seek professional advice for complex matters or disputes.

How the committee spending limit works

In Queensland, body corporate committees under the Standard Module, Accommodation Module and Small Schemes Module have a spending limit—the maximum they can spend without a general meeting resolution. This helps committees handle day-to-day maintenance while keeping larger decisions with the owners.

The default committee spending limit is $200 multiplied by the number of lots in your scheme. A 10-lot scheme has a $2,000 committee limit; a 50-lot scheme has $10,000.

The body corporate can change this limit by ordinary resolution at a general meeting. There is no minimum or maximum set by law—the owners decide what works for their building.

The major spending limit and two-quote rule

The major spending limit does not restrict how much can be spent. Instead, it determines when two quotes are required. Spending above the major spending limit requires at least two quotations to be obtained and considered—whether the decision is made by the committee or at a general meeting.

The default major spending limit is the lesser of:

  • $1,100 multiplied by the number of lots, or
  • $10,000

For example, a 5-lot scheme has a major spending limit of $5,500. An 11-lot scheme is capped at $10,000 (since 11 × $1,100 = $12,100 exceeds the cap).

The body corporate can set a different major spending limit by ordinary resolution. There is no minimum or maximum prescribed.

Worked examples

Example 1: Small repair within limits

A 6-lot body corporate needs to spend $900 on an emergency exit light repair.

  • Committee spending limit (default): $1,200 (6 × $200)
  • Major spending limit (default): $6,600 (6 × $1,100)

Result: The $900 is within the committee limit, so the committee can approve it at a committee meeting. It is also below the major spending limit, so there is no legislative requirement for two quotes (though getting quotes is still prudent).

Example 2: Spending above committee limit

The same 6-lot body corporate needs $5,000 for common area painting.

  • Committee spending limit: $1,200
  • Major spending limit: $6,600

Result: The $5,000 exceeds the committee limit ($1,200), so it needs an ordinary resolution at a general meeting. However, it is below the major spending limit ($6,600), so there is no two-quote requirement.

Example 3: Spending above major limit

A 20-lot body corporate needs $12,000 for roof repairs.

  • Committee spending limit (default): $4,000 (20 × $200)
  • Major spending limit: $10,000 (capped)

Result: The $12,000 exceeds both limits. It requires a general meeting resolution. Because it exceeds the major spending limit ($10,000), at least two quotes must be obtained and included with the notice of the general meeting.

Example 4: Custom limits set by resolution

A 15-lot body corporate has set a custom committee spending limit of $10,000 by ordinary resolution.

  • Committee spending limit (custom): $10,000
  • Major spending limit (default): $10,000 (capped)

For an $8,000 repair: the committee can approve it (within its $10,000 limit). It is also within the major spending limit, so no two-quote requirement applies.

For a $9,500 repair: still within the committee limit. Below the major spending limit. Committee can approve without two quotes.

Exceptions for committee spending

A committee may spend above its limit without a general meeting resolution only in specific circumstances:

  • Ordinary resolution: The body corporate has already authorised the spending at a general meeting
  • Written consent: All lot owners have given written consent
  • Adjudicator emergency order: An adjudicator has authorised the spending to meet an emergency
  • Compliance: The spending is required to comply with a statutory order, adjudicator's order, or court judgment
  • Insurance: Putting in place or renewing a relevant policy of insurance (if not a restricted issue)

The committee cannot self-authorise emergency spending. An adjudicator application is required, and the adjudicator must be satisfied the work is so urgent that the body corporate cannot wait for a general meeting (which can be called with 21 days notice).

Single project rule

The legislation prevents splitting a single project into smaller amounts to stay under the limits. If a series of proposals forms a single project, the cost of the whole project determines whether the spending limit or two-quote threshold applies.

For example, if a building exterior repaint costs $25,000 in total, the body corporate cannot split it into five $5,000 contracts to avoid the general meeting requirement or the two-quote rule.

Budget provision

Even if spending is within the committee limit, the committee should check that there is adequate provision in the budget for the expense. If not, a general meeting may be needed to amend the budget or raise a special levy—regardless of the spending limit.

Commercial and two-lot schemes

The rules above apply to the Standard Module, Accommodation Module and Small Schemes Module. Two other modules work differently:

Commercial Module: The committee has no spending limit and can spend as much as needed, properly authorised at a committee meeting or by a vote outside a committee meeting. There is no statutory two-quote requirement.

Specified Two-lot Schemes Module: There is no committee. The two lot owners make decisions by lot owner agreement. There are no statutory spending limits or quote requirements. Each owner pays their share according to their contribution schedule lot entitlement.

Important notes

GST-inclusive amounts: The committee spending limit and major spending limit are GST-inclusive figures. When comparing a quoted price to the limits, use the total price including GST.

Layered schemes:For layered (tiered) community titles schemes, the number of lots is the scheme's own lots—including any layered lots within that scheme.

Accommodation Module: This module applies to schemes where lots are mainly accommodation or hotel lots (s 3, Accommodation Module Regulation 2020).

Small Schemes Module: This module applies only to a basic scheme with no letting agent, 6 or fewer lots, and a community management statement that names this module (s 3, Small Schemes Module Regulation 2020).

Frequently asked questions

What is the committee spending limit?
The committee spending limit is the maximum amount a body corporate committee can spend without requiring approval at a general meeting. Under the Standard, Accommodation and Small Schemes modules, if no custom limit has been set, the default is $200 multiplied by the number of lots in the scheme.
What is the major spending limit?
The major spending limit determines when two quotes are required, not how much can be spent. If no custom limit has been set, the default is the lesser of $1,100 multiplied by the number of lots, or $10,000. Spending above this limit requires at least two quotes to be obtained and considered.
Can the body corporate change these limits?
Yes. The body corporate can set different limits by ordinary resolution at a general meeting. There is no minimum or maximum prescribed by the legislation—the owners can set whatever limits suit their scheme.
When are two quotes required?
Two quotes are required when the spending exceeds the major spending limit. This applies whether the committee is deciding (within its committee limit) or the body corporate is deciding at a general meeting. If exceptional reasons make two quotes impracticable, one quote may suffice.
Can the committee spend above its limit in an emergency?
The committee can only exceed its spending limit if an adjudicator authorises the spending to meet an emergency. The adjudicator must be satisfied the work is so urgent that the body corporate cannot wait for a general meeting (minimum 21 days notice). The committee cannot self-authorise emergency spending.
What about the Commercial Module?
Schemes under the Commercial Module must have a committee, but the committee has no spending limit. The committee can spend as much as needed, authorised at a committee meeting or by a vote outside a committee meeting. There is also no statutory two-quote requirement, though obtaining quotes remains prudent.
What about two-lot schemes?
Schemes under the Specified Two-lot Schemes Module do not have a committee. The two lot owners decide body corporate matters by written lot owner agreement. There are no statutory spending limits or quote requirements. Each owner pays their share according to their contribution schedule lot entitlement.
Does budget provision matter?
Yes. Even if spending is within the committee limit, the committee should ensure there is adequate budget provision for the expense. If not, a general meeting may be needed to amend the budget or raise a special levy.

Sources

This calculator is based on the following Queensland legislation and official guidance:

Last verified: October 2026. If you believe something has changed, please let us know.

Collecting quotes for your body corporate?

Bloc helps Queensland committees collect and compare quotes for common property repairs. Owners review trade messages before they're sent and approve spending together. The quote history stays with your building.

Learn how Bloc works for committees